ET-4C3 (6/24/05 version)
Chemical Integrity: Proposed Sediment Reduction Targets

Given the need to analyze the existing sediment reduction targets and refine as applicable to water quality attainment, only one additional sediment reduction target was proposed as outlined below.

Target 1: By 2010, reduce statewide sediment loadings by at least 920 tons/year (Level 3);

Baseline: The sediment loading reduction target is based on estimates from 2001-2004 319 grant implementation and ODNR Pollution Abatement Cost-Share projects, and what is expected with consistent levels of activity through 2010.